ci: dedicated 'validate (overlays)' gate for the particular calendars (#87) #470
No reviewers
Labels
No labels
area: build
area: ci
area: compare
area: data
area: engine
area: model
area: provenance
area: rite
area: validation
backport
blocked
breaking
confirmed
dependencies
duplicate
epic
github_actions
invalid
needs-info
needs-triage
php
priority: high
priority: low
priority: medium
regression
type: bug
type: chore
type: correction
type: docs
type: enhancement
type: feature
type: fix
type: perf
type: refactor
type: security
wontfix
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
Directorium/Core!470
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "feature/87-overlay-ci-gates"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Closes #87.
Gives the four particular-calendar overlays their own named CI gate. The SSPX, Generic 1962, FSSP, and ICKSP conformance tests move to a dedicated PHPUnit
@group overlays, and thevalidatematrix gains anoverlaysleg — so overlay drift fails as a distinct, independently-requireable check (validate (overlays)) rather than sharing the 1962 edition leg.validate (1962)→ base-1962 oracles (Computus vseaster_days(), missalemeum)validate (overlays)→ SSPX (vs its live ordo feed), FSSP & ICKSP (vs pinned proper-day fixtures), Generic 1962 (the identity-overlay proof)Matches #87's acceptance: SSPX validated against its feed, FSSP/ICKSP/Generic against pinned fixtures, and any divergence fails the build. The one remaining #87 item — a Cum sanctissima dedicated resolution test — travels with #85, which is deferred to v2.3.0 (the 2020 decree needs a post-1960-canonized-saints corpus, built there; the toggle has no eligible saint to resolve until then).
Docs
No engine or corpus change — test grouping + CI matrix + docs only. Local:
validate (overlays)= 13 tests,validate (1962)= 8; full validation suite 60 pass (1 pre-existing skip); lint/analyse clean.