[Epic] Society and institute overlays #79

Closed
opened 2026-07-01 00:53:15 +00:00 by manlycucumber · 2 comments
manlycucumber commented 2026-07-01 00:53:15 +00:00 (Migrated from github.com)

Ship the SSPX, FSSP, and ICKSP particular-calendar overlays plus a Generic 1962 baseline, each validated against its proper feasts. Done when each overlay resolves its distinctive days correctly.

Epic — child issues are tracked as sub-issues.


AC amendment (roadmap v3 — priority): author the SSPX overlay FIRST — it is the release vehicle for the 3mi.org Ordo plugin (R2). FSSP/ICKSP follow. Ship as soon as SSPX is validated; do not block the first release on the others.

Ship the SSPX, FSSP, and ICKSP particular-calendar overlays plus a Generic 1962 baseline, each validated against its proper feasts. Done when each overlay resolves its distinctive days correctly. _Epic — child issues are tracked as sub-issues._ --- **AC amendment (roadmap v3 — priority):** author the **SSPX overlay FIRST** — it is the release vehicle for the 3mi.org Ordo plugin (R2). FSSP/ICKSP follow. Ship as soon as SSPX is validated; do not block the first release on the others.
manlycucumber commented 2026-07-02 21:22:24 +00:00 (Migrated from github.com)

First child #80 (SSPX) is done and conformance-gated (PR #445). The overlay pipeline (epic #75) makes each remaining child cheap: a new tools/generator/facts/overlays/<slug>.yaml + its oracle fixture.

Prerequisite for #81 (FSSP) and #82 (ICKSP): each needs a harvested ordo oracle fixture (the equivalent of tests/Validation/fixtures/sspx, harvested from that institute's published 1962 ordo) before its overlay can be authored under the born-cited + conformance discipline. Authoring without a validation source would break that discipline, so these are blocked on an offline harvest step (maintainer). #83 (Generic 1962 baseline) is an empty overlay = the universal calendar and needs no fixture.

First child #80 (SSPX) is done and conformance-gated (PR #445). The overlay pipeline (epic #75) makes each remaining child cheap: a new `tools/generator/facts/overlays/<slug>.yaml` + its oracle fixture. **Prerequisite for #81 (FSSP) and #82 (ICKSP):** each needs a **harvested ordo oracle fixture** (the equivalent of `tests/Validation/fixtures/sspx`, harvested from that institute's published 1962 ordo) before its overlay can be authored under the born-cited + conformance discipline. Authoring without a validation source would break that discipline, so these are blocked on an offline harvest step (maintainer). #83 (Generic 1962 baseline) is an empty overlay = the universal calendar and needs no fixture.
manlycucumber commented 2026-07-10 20:46:06 +00:00 (Migrated from github.com)

Epic complete — all four particular-calendar overlays are shipped and green in CI:

  • #80 SSPX — St Pius X + Seven Sorrows elevated to first class; cross-checked against the live SSPX ordo feed.
  • #83 Generic 1962 — the identity overlay (zero operations), proved byte-identical to the universal calendar across 1096 days.
  • #81 FSSP — Chair of St Peter (22 Feb) II→I; cited the FSSP-published calendar.
  • #82 ICKSP — its four patrons (de Sales, Aquinas, Benedict, Thérèse) III→I; cited the Institute's published ordos.

The FSSP/ICKSP elevations were established by an adversarial multi-source research + verification pass (official society ordos printing the ranks), authored clean-room as re-ranks of existing universal feasts (no new transcribed strings), and gated by pinned proper-day conformance fixtures. Each overlay documents its scope as a non-exhaustive, well-attested subset — not the complete promulgated Proprium.

Closing the epic. Remaining v0.2.0 items are the Cum sanctissima toggle (#85) and the CI-gate consolidation (#87).

Epic complete — all four particular-calendar overlays are shipped and green in CI: - **#80 SSPX** — St Pius X + Seven Sorrows elevated to first class; cross-checked against the live SSPX ordo feed. - **#83 Generic 1962** — the identity overlay (zero operations), proved byte-identical to the universal calendar across 1096 days. - **#81 FSSP** — Chair of St Peter (22 Feb) II→I; cited the FSSP-published calendar. - **#82 ICKSP** — its four patrons (de Sales, Aquinas, Benedict, Thérèse) III→I; cited the Institute's published ordos. The FSSP/ICKSP elevations were established by an adversarial multi-source research + verification pass (official society ordos printing the ranks), authored clean-room as re-ranks of existing universal feasts (no new transcribed strings), and gated by pinned proper-day conformance fixtures. Each overlay documents its scope as a non-exhaustive, well-attested subset — not the complete promulgated Proprium. Closing the epic. Remaining v0.2.0 items are the Cum sanctissima toggle (#85) and the CI-gate consolidation (#87).
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Directorium/Core#79
No description provided.