[Epic] Society and institute overlays #79
Labels
No labels
area: build
area: ci
area: compare
area: data
area: engine
area: model
area: provenance
area: rite
area: validation
backport
blocked
breaking
confirmed
dependencies
duplicate
epic
github_actions
invalid
needs-info
needs-triage
php
priority: high
priority: low
priority: medium
regression
type: bug
type: chore
type: correction
type: docs
type: enhancement
type: feature
type: fix
type: perf
type: refactor
type: security
wontfix
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
Directorium/Core#79
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Ship the SSPX, FSSP, and ICKSP particular-calendar overlays plus a Generic 1962 baseline, each validated against its proper feasts. Done when each overlay resolves its distinctive days correctly.
Epic — child issues are tracked as sub-issues.
AC amendment (roadmap v3 — priority): author the SSPX overlay FIRST — it is the release vehicle for the 3mi.org Ordo plugin (R2). FSSP/ICKSP follow. Ship as soon as SSPX is validated; do not block the first release on the others.
First child #80 (SSPX) is done and conformance-gated (PR #445). The overlay pipeline (epic #75) makes each remaining child cheap: a new
tools/generator/facts/overlays/<slug>.yaml+ its oracle fixture.Prerequisite for #81 (FSSP) and #82 (ICKSP): each needs a harvested ordo oracle fixture (the equivalent of
tests/Validation/fixtures/sspx, harvested from that institute's published 1962 ordo) before its overlay can be authored under the born-cited + conformance discipline. Authoring without a validation source would break that discipline, so these are blocked on an offline harvest step (maintainer). #83 (Generic 1962 baseline) is an empty overlay = the universal calendar and needs no fixture.Epic complete — all four particular-calendar overlays are shipped and green in CI:
The FSSP/ICKSP elevations were established by an adversarial multi-source research + verification pass (official society ordos printing the ranks), authored clean-room as re-ranks of existing universal feasts (no new transcribed strings), and gated by pinned proper-day conformance fixtures. Each overlay documents its scope as a non-exhaustive, well-attested subset — not the complete promulgated Proprium.
Closing the epic. Remaining v0.2.0 items are the Cum sanctissima toggle (#85) and the CI-gate consolidation (#87).